Rates/Terms/Conditions
1. Skilled Labor Rate: $75.00 per hour
2. Haul & Launch charges per foot: up to 55' - $ 5.00/ft (Minimum charge - $200
56' to 64' - $ 6.00/ft
65' & up - $10.00/ft
(a.) Special blocking of spray/rub rails $75/hour
3. Staging and Blocking labor rate: $75 per man-hour
4. Bottom Cleaning labor rates: Pressure Washing $2.00/ft
(a.) Minimum charge - $100
(b.) Scraping charge - $45/man-hour
(c.) Bottom Sanding & Priming charge - $55/man-hour
5. Storage is charged on all vessels
(a.) Dry Storage rate: $3.00/ft per day (Contractors)
(b.) Dry Storage rate: $2.00/ft per day (All other vessels)
(c.) Slip Rental: Working slip rate is $3.00/ft per day
(d.) Dockage up to 65' - $1.25/ft per day, plus electric
(e.) Sub-contractor facility usage fee - $50 per day
(f.) Electric - $12.50 per day/per 50 amp
(g.) Electric - $6.00/day - on land, no appliances
(h.) Cooling Tower - $50/per day plus installation &
breakdown - $75/hour (approx 5 hours)
NOTE: Vessels pay one full day rate for arrival day and one half
day rate for departure day regardless of arrival or departure time.
HURRICANE STORAGE - JUNE 1 - NOVEMBER 30
A $500 Deposit and Signed Contract are Required
Contact office for details
6. Covered Work Shed: $300/day
7. Load/Unload from Trailer:
(a.) Travel Lift Charge: $10/ft
(b.) Forklift Charge: $10/ft
8. Equipment Rental:
(a.) Forklift w/Operator: $100/half hour
9. Safe Harbor Affidavit Processing Fee: $100
10. Trash and Water Service: $10/day (required for all vessels)
11. Environmental/S.R.L.L.I. Impact Fee: 3.5% of Total Invoice
12. If invoice is paid by cash or check, labor rate may be reduced by $2.00/man-hour
13. 24 Hour Notice to Launch Vessel
ALL DO-IT-YOURSELF CONTRACTORS: All major materials from the waterline down must be purchased from our on-site stockroom. There is a 15% charge on labor, material and services on all contractor work performed on vessel.
OUTSIDE CONTRACTORS: Everyone must check in at the Service Office, must have proof of insurance and confirm billing arrangements with the Service Department prior to commencing work.